Client: ACSM Agam
Project: District heating network extension at the municipality of Monza
Services: Final design and construction supervision
Location: Monza (MB)
Status: Completed
Year: 2017 - 2020

The underground crossing project covers the following railway lines:

  • RFI Monza - Calolziocorte line at mileage 1+751.09 (2-track line);

  • RFI Monza - Molteno line at mileage 1+749.79 (1-track line);

planned at the level crossing of via Osculati in the municipality of Monza (MB).

The crossing involves the district heating network of the company Varese Risorse Spa (Acsm-Agam Spa group based in Monza).

A DN 1200 mm steel pipeline (serving as a protection pipe) was planned to be installed, within which the two DN 250 steel service pipes (delivery pipeline and return pipeline of the district heating network) will later be laid.